30.1.07

Waiting, Waiting, Waiting.

Waiting for something you really want or like can be a frustrating experience, but one that makes it that much sweeter when it finally comes to you. Right now, before we continue any further on our project, we are waiting for a few key pieces of the puzzle.

Before there were township by-laws regarding the power of the Grand River Conservation Authority(GRCA), or a 100 year flood line as high as it is now (thanks to Hurricane Hazel1954), houses could be built in many areas they are now prohibited in. Our house is one of those cases. As it stands right now, the house has one of its corners in the floodline, is within 120 m of a wetland, and close to a steep slope all of which are considered hazards by the conservation authority. This means of course, before getting any sort of permission to construct or alter anything on the house outside of its current footprint, we must get a permit from the authority. This means of course more money to them. I have no problem with a conservation authority protecting water ways in fact I support them, but I must say, they do take their time..

An interesting note is that before we can get any permits issued from the township (ie building) , we must have all permissions cleared from the GRCA to move on. It's a sequence of events that must be followed in a certain order or much time will be wasted back tracking. I'm a little ashamed to say that we have spent some time back tracking - but we now know the process for next time.

In our house, we have planned to use composting toilets. With this in mind, we originally opted for only a greywater system. We spent time and money getting a system designed by some very intelligent and talented people. In the end, our township denied our request because of our proximity to the floodline and the system although stamped by an engineer (who is a specialist in his field) was not provincially approved.

This means that we have had to move ahead and install a traditional septic system instead, which is way more intrusive than a greywater system in its installation. Also, the septic system will be dealing with greywater only which may be a problem on its own, because this is not what they are designed to do. It will be interesting to see in time how the septic system will deal with this huge amount of greywater.

So the waiting continues. Lately we have been biding our time attaching garage door seconds to the inside of the garage walls for insulation and preparing other things for the time when the building permit is ready. I am told that the GRCA has a meeting today, and if the results of the meeting are good, we may finally have a building permit in a few weeks, and then the shit will hit the fan. Lookout New Dundee!

No comments: